Skip to content
HUMANOIDROBOTICS
Logistics & ports

The shift you cannot staff is your first cost

Warehouses, 3PL operators and terminals share one problem: repetitive physical work that nobody wants to do on the third shift.

The picture

This is where a robot pays off first in Greece

In Greek distribution centres demand is seasonal and sudden. People cannot be found at the moment they are needed, and training a new person costs weeks.

A humanoid or a quadruped does not solve the whole warehouse. It solves specific positions: feeding the packaging line, moving crates, night patrol and stock checking.

3Shifts

A robot also works the third shift without a premium.

40 kgPayload

Quadruped B2 while walking, for moving equipment.

4-8Pilot weeks

That is what it takes to get a measurable result.

24/7Logging

Every movement is documented for your WMS.

Tasks

What the robot takes over

01

Palletising and depalletising

A steady rhythm at hours when the team gets tired.

02

Line feeding

The robot keeps the line supplied, the operator checks quality.

03

Moving crates

Routes a person currently walks with a trolley.

04

Stock checking

Night scanning of racks with a camera, compared against the WMS.

05

Security patrol

A quadruped with a camera indoors outside working hours.

06

Vehicle loading

Support for repetitive movements near the ramp.

Frequently asked questions

Frequently asked questions

Not necessarily. We start with positions that work with the space you have. If changes are needed, they go into the study before you buy.
It depends on the model. For cold rooms we select platforms rated for the temperature and protected against humidity.
A pilot of four to eight weeks produces real numbers from your own flow.

Show us one shift

A ten minute video from the line is enough for a first assessment.